top of page

Grade 2 renovation

The original low ceiling was demolished and replaced with an oak framed vaulted ceiling.

In line with conservation all work had to take place inside the building apart from the addition of the conservation skylights.

Original woodwork was sanded back to match in with new frame and walls and ceiling were decorated by our team.

© 2018 Integra Construction. Proudly created with Wix.com

bottom of page